Home

Weblog (home)

Knitalong

Pattern of
the Month

On the Needles
(...and Off the Needles)

Stitchcraft

Vintage
Patterns

About the
Idle Hands

« Summer Flowers | Main | As high as an elephant's eye... »

Monday August 24, 2015

Cleaning and Creativity

Mirror.jpg

Apparently not much happened this month - mostly because I was doing rather than writing about it.

I finally finished off an "artisan" mirror to match the tiling in our new French bathroom. This project turned out to be an incredible palava - reminding me yet again of my Father's quote "you do like to enjoy yourself don't you?". I bought a reduced price beaten up mirror from B&Q - and then proceeded to beat it up even more. It already had the basic structure I wanted, being inset, and framed with a plain white surround. I removed the latter to replace with mosaic tiles - I then had to route out the surround further to accommodate the depth of the tiles, repair the wood to make up for my very poor routing (!), cut the mosaics to make them fit the shape, stick the tiles down with two types of glue, paint the frame a dark brown to match the bathroom, and finally grout the tiles.... I then had to repaint the surround as the grouting process pulled off the paint.... the whole project has been plagued with so many similar small difficulties that I should not have been surprised by any of this.
I have now created a mirror which is so heavy that I am not even sure how to fix it to the wall as the frame is not robust enough to support the increased weight. I feel with the cost of the mosaic panel and the epoxy glue, I would have done better to start from scratch...

In addition, a lot of August was taken up with preparing for the rebuild (or new build) of our utility area on the side of the house. George has managed a lot of the reorganisation on his own, and as of the day we left for France, we had no hot water or central heating , and our washing machine is resident outside the front door of the house, (a very attractive feature), in the hope that during the 10 week build we can use it in that position.

Spurred on by all this activity (and an apparent moth infestation) I cleared out a lot of old clothes and cleaned and sprayed the bedroom. I took the opportunity to install new blinds and curtains - with 5 double windows in the room that took a lot of time and effort, even though it was a budget solution from IKEA.

After all this there is a plus side - by October we will at last have a proper weather-proof room to the side of the house instead of the shack of the last 15 years. The kitchen and bathroom in France are to all intents and purposes up and running - even with lots of finishing detail still to be done inside - and the outside rendering needs to get going while there is still a chance if some good weather (as I sit here the rain is beating against the window...). However we have tried out both dishwasher and washing machine, the cooker is back in position, and we have moved our "stuff" back in - leaving loads of scope for yet more cleaning in the living room (groan...).

Posted by Christina at 9:21 AM. Category: Crafts

Comments